150 Production Management and Industrial Engineering Multiple choice Questions and Answers pdf

106.    Which one of the following represents a group incentive plan ?
(a)    Scanlon Plan
(b)    Rowan Plan
(c)    Bedaux Plan
(d)    Taylor Differential Piece Rate System
(e)    Halsey Premium Plan.
Ans: a

107.    In the Halsey 50-50 plan, the following are rewarded more
(a)    past good workers
(b)    past poor workers
(c)    past average workers
(d)    all of the above
(e)    none of the above.
Ans: b

108.    In the Halsey system of wage incentive plan, a worker is
(a)    paid as per efficiency
(b)    ensured of minimum wages
(c)    not paid any bonus till his efficiency 2 reaches 66 %
(d)    never a loser
(e)    induced to do more work.
Ans: b

109.    'Value' for value engineering and analysis purposes is defined as
(a)    purchase value
(b)    saleable value
(c)    depreciated value
(d)     present worth
(e)     function/cost.
 Ans: e

110.    Break-even analysis can be used for
(a)    short run analysis
(b)    long run analysis
(c)    average of above two run analysis
(d)    there is no such criterion
(e)    none of the above.
Ans: a

111.    CPM has following time estimate
(a)    one time estimate
(b)    two time estimate
(c)    three time estimate
(d)    four time estimate
(e)    nil time estimate.
Ans: a

112.    PERT has following time estimate
(a)    one time estimate
(b)    two time estimate
(c)    three time estimate
(d)    four time estimate
(e)    nil time estimate.
Ans: c

113.    In Lincoln plan (one type of group incentive plan), the amount of the profit which an .employee receives in addition to the guaranteed basic pay/wages, is based on :
(a)    a standard rating system
(b)    a merit rating system
(c)    a job evaluation system
(d)    his individual performance
(e)    all of the above.
Ans: b

114.    Which of the following incentive pleasures a part of the swing to the worker and rest to the employer
(a)    Emerson efficiency plan
(b)    Taylor plan
(c)    Halsey premium plan
(d)     Piece rate system
(e)     Gilberth plan.
Ans: c

115.    Which of the following is not wage incentive plan
(a)    differential piece rate system
(b)    Rowan plan
(c)     Emerson plan
(d)     Taylor plan 
(e)     Halsey plan.
Ans: d

116.    PMTP (predetermined motion time systems) include
(a)    MTM (method time measurement)
(b)    WFS (work factor systems)
(c)    BNTS (basic motion time study)
(d)    all of the above
(e)    none of the abbvev
Ans: d

117.    Which of the following plans motivates supervisors by paying a premium on time saved by workers
(a)     Halsey plan
(b)     Rowan plan
(c)     Haynes plan
(d)     Emerson's plan
(e)     Taylor's plan.
Ans: c

118.    The time required to complete a task is established and a bonus is paid to the worker for every hour he saves from the established time required. This type of incentive plan is known as
(a)    Rowan Plan
(b)    Bedaux Plan
(c)    Taylor Differential Piece rate system
(d)    Halsey Premium plan
(e)    Day work plan.
Ans: d

119.    One of the basic essentials of an incentive plan is that
(a)    a differential piece rate system should exist
(b)    minimum wages should be guaran¬teed
(c)    provide incentive to group efficiency performance
(d)    all standards should be based on optimum standards of production
(e)    all standards should be based on time studies.
Ans: e

120.    In the Emerson efficiency plan, a worker receives only his daily wage and no bonus is paid till his efficiency reaches
(a)     50%
(b)     661%
(c)     75%
(d)     80%
(e)     90%.
Ans: b

Read More Questions:
Production Management and Industrial Engineering MCQs Part1
Production Management and Industrial Engineering MCQs Part2

Objective Production Management and Industrial Engineering Questions and Answers pdf

91.    The employees provident fund act is applicable to
(a)    all industries
(b)    all  industries  other than small and medium industries
(c)    volunteers
(d)    the industries notified by Government
(e)    all major industries.
Ans: d

92.    The amount deducted from the salary of workers towards employees provident fund is
(a)    credited into reserves of company
(b)    deposited in nationalized bank
(c)    deposited in post office
(d)    deposited in the account of worker with employer or Reserve Bank of India
(e)    deposited in the account of worker with Provident Fund Commissioner.
Ans: e

93.    The deductions for, employees provident fund start
(a)    immediately on joining the service
(b)    after 60 days of joining the service
(c)    after 100 days of joining the service
(d)    after 240 days of joining the service
(e)    after one year of joining the service.
Ans: d

94.    Father of time study was
(a)     F.W. Taylor
(b)     H.L. Gantt
(c)     F.B. Gilberfh
(d)     R.M. Barnes
(e)     H.B. Maynord.
Ans: a

95.    Tick the odd man out
(a)     Taylor
(b)     Drucker
(c)     McGregor   
(d)     Galileo
(e)     Parkinson.
Ans: d

96.    Current assets include
(a)    manufacturing plant
(b)    manufacturing plant and equipment
(c)    inventories
(d)    common stock held by the firm
(e)    all of the above.
Ans: a

97.    The objective of time study is to determine the time required to complete a job by
(a)     fast worker 
(b)     average worker
(c)     slow worker
(d)     new entrant
(e)     any one of the above.
Ans: b

98.    Job enrichment technique is applied to
(a)    reduce labour monotony
(b)    overcome boring and demotivating work
(c)    make people happy
(d)    all of the above
(e)    none of the above.
Ans: d

99.    For ship vessel industry  the  following layout is best suited
(a)    process layout
(b)    product layout
(c)    fixed position layout
(d)    plant layout
(e)    functional layout.
Ans: c

100.    In Halsey 50-50 plan, output standards are established
(a)    by time study
(b)    from previous production records
(c)    from one's judgement
(d)    all of the above
(e)    none of the above.
Ans: b

101.    Routing is essential in the following type of industry
(a)    assembly industry
(b)    process industry
(c)    job order industry
(d)    mass production industry
(e)    steel industry.
Ans: a

102.    An optimum project schedule implies
(a)    optimum utilization of men, machines and materials
(b)    lowest possible cost and shortest possible time for project
(c)    timely execution of project
(d)    to produce best results under given constraints
(e)    realistic  execution  time,  minimum cost and maximum profits.
Ans: b

103.    Graphical method, simplex method, and transportation method are concerned with
(a)     break-even analysis
(b)     value analysis
(c)     linear programming
(d)    queuing theory
(e)    material handling.
Ans: c

104.    In crash programe for a project
(a)    both direct and indirect costs, increase
(b)    indirect costs increase and direct costs decrease
(c)    direct costs increase and indirect costs decrease
(d)     cost is no criterion
(e)     none of the above.
Ans: c

Read More Questions:
Production Management and Industrial Engineering MCQs Part1
Production Management and Industrial Engineering MCQs Part2

Most recently Production Management and Industrial Engineering Multiple choice Questions and Answers pdf

61.    Father of industrial engineering is
(a)     Jeck Gilberth
(b)     Gnatt
(c)     Taylor
(d)     Newton
(e)     none of the above.
Ans: b

62.    The grouping of activities into organisational units is called
(a)    corporate plans
(b)    higher level management
(c)    functional authority
(d)    departmentatidn
(e)    company policy.
Ans: d

63.    Which of the following organisation is preferred in automobile industry
(a)     functional organisation
(b)    line organisation
(c)    staff organisation
(d)    line and staff organisations
(e)    scalar organisation.
Ans: d

64.    Which of the following organisations is best suited for steel plants
(a)    functional organisation
(b)    line organisation
(c)    staff organisation
(d)    line, staff and functional organisations
(e)    scalar organisation.
Ans: a

65.    The wastage of material in the store is taken into account by the following method in the evaluation of the material issued from the store
(a)    inflated system
(b)    primary cost method
(c)    current value method
(d)    fixed price method
(e)    variable price method.
Ans: a

66.    Which of the following is independent of sales forecast
(a)    productivity
(b)    inventory control
(c)    production planning
(d)    production control
(e)    capital budgeting.
Ans: a

67.    Gnatt charts are used for
(a)    forecasting sales
(b)    production schedule
(c)    scheduling and routing
(d)    linear programming
(e)    none of the above.
Ans: b

68.    Inventory management consists of
(a)    effective running of stores
(b)    state of merchandise methods of stroing and maintenance etc.
(c)    stock control system
(d)     all of the above
(e)     none of the above.
Ans: d

69.    Gnatt charts provide information about
(a)    break even point analysis
(b)    production schedule
(c)    material handling layout
(d)    determining selling price
(e)    value analysis.
Ans: b

70.    Inventory control in production, planning and control aims at
(a)     achieving optimization
(b)    ensuring against market fluctuations
(c)    acceptable customer service at low capital investment in inventory
(d)     discounts allowed in bulk purchase
(e)     regulate supply and demand.
Ans: c

71.    In inventory control, the economic order quantity is the
(a)    optimum lot size
(b)    highest level of inventory
(c)    lot corresponding to break-even point
(d)    capability of a plant to produce
(e)    none of the above.
Ans: a

72.    Statistical quality control techniques are based on the theory of
(a)    quality
(b)     statistics
(c)     probability
(d)     all of the above
(e)     none of the above.
Ans: c

73.    The appellate authority for an industrial dispute is
(a)     management
(b)    labour court
(c)    high court/supreme court
(d)    board of directors
(e)    president.
Ans: c

74.    Under the Apprenticeship Act
(a)    all industries have to necessarily train the apprentices
(b)    industries have to train apprentices ac-cording to their requirement
(c)    all industries employing more than 100 workers have to recruit apprentices
(d)    only industries employing more than 500 workers have to recruit apprentices
(e)    all industries other than small scale industries have to train apprentices.
Ans: d

75.    Standing orders which are statutory are applicable to
(a)    all industries
(b)    all process industries and thermal power plants
(c)    only major industries
(d)    only key industries
(e)    all industries employing more than 100 workers.
Ans: e