Tricky Production Management and Industrial Engineering Interview Questions and Answers pdf

121.    Accordmg to Rowan plan, if H = hourly rate, A = actual time and S = standard time, then wages will be
(a)    HA
(b)    HA + (S~A) HA
(c)    HA + ^^-H
(d)    HA + ^^-H
(e)    HA + ^^-HA.
Ans: b

122.    If a worker gets a daily wage of Rs HA, then according to Rowan plan, his maximum daily earnings can be
(a)     2 HA
(b)     1.33 HA
(c)     1.5 HA
(d)     1.15 HA
(e)     2.5 HA.
Ans: a

123.    In A-B-C control policy, maximum attention is given to
(a)    those items which consume money
(b)    those items which are not readily available
(c)    thosex items which are in more demand
(d)    those items which consume more money
(e)    proper quality  assurance program-mes.
Ans: d

124.    Which one of the following represents a group incentive plan ?
(a)    Halsey Premium Plan
(b)    Bedaux Plan
(c)    Lincoln Plan
(d)    Rowan Plan
(e)    Taylor Plan.
Ans: c

125.    The mathematical technique for finding the best use of limited resources in an optimum manner is known as
(a)    operation research
(b)    linear programming
(c)    network analysis
(d)    queuing theory
(e)    break-even analysis.
Ans: b

126.    In order that linear programming techniques provide valid results
(a)    relations between factors must be linear (positive)
(b)    relations between factors must be linear (negative)
(c)    (a) or (b)
(d)    only one factor should change at a time, others remaining constant
(e)    none of the above.
Ans: c

127.    The linear programming techniques can be applied successfully to industries like
(a)    iron and steel
(b)    food processing
(c)    oil and chemical
(d)    banking
(e)    all of the above.
Ans: e

128. The simplex method is the basic method for
(a)     value analysis
(b)     operation research
(c)    linear programming
(d)    model analysis
(e)    none of the above.
Ans: c

129.    The two-bin system is concerned with
(a)    ordering procedure
(b)    forecasting sales
(c)    production planning
(d)     despatching and expediting
(e)     none of the above.
Ans: a

130.    The time required to complete a job is established and a bonus is paid to the worker based on the exact % of time
saved. This type of incentive plan is known as
(a)    Dry work Plan
(b)    Halsey Premium Plan
(c)    Taylor Plan
(d)    Bedaux Plan
(e)    Rowan Plan.
Ans: e

131. Replacement studies are made on the fol-lowing basis:
(a)    annual cost method
(b)    rate of return method
(c)    total life average method
(d)    present worth method
(e)     any one of the above.
Ans: e

132.    String diagram is used
(a)    for checking the relative values of various layouts
(b)    when a group of workers are working at a place
(c)    where processes require the operator to be moved from one place to another
(d)    all of the above
(e)    none of the above.
Ans: d

133.    Which of the following depreciation system ensures that the interest be charged on the cost of machine asset every year on the book value, but the rate of depreciation every year remains constant
(a)    sinking fund method
(b)    straight line method
(c)    A-B-C charging method
(d)    annuity charging method
(e)    diminishing balance method.
Ans: d

134.    Bin card is used in
(a)    administrative wing
(b)    workshop    
(c)     foundary shop
(d)     stores
(e)     assembly shop.
Ans: d

135.    Slack represents the difference between the
(a)    latest allowable time and the normal expected time
(b)    latest allowable time and the earliest expected time
(c)    proposed allowable time and the ear-liest expected time
(d)    normal allowable time and the latest expected time
(e)    project  initiation tune and actual starting time.
Ans: b

136.    PERT and CPM are
(a)    techniques to determine project status
(b)    decision making techniques
(c)    charts which increase aesthetic ap-pearance of rooms
(d)    aids to determine cost implications of project
(e)    aids to the decision maker.
Ans: e

137.    A big advantage of PERT over Gantt charts is that in the former case
(a)    activities and events are clearly shown
(b)    early start and late finish of an ac¬tivity are clearly marked
(c)    activity times are clear
(d)    critical path can be easily determined
(e)    inter-relationship among activities is clearly shown.
Ans: e

138.    CPM is the
(a)    time oriented technique
(b)    event oriented technique
(c)    activity oriented technique
(d)    target oriented technique
(e)    work oriented technique.
Ans: c

TOP Production Management and Industrial Engineering Multiple choice Questions and Answers pdf

16.    In perpetual inventory control, the material is checked as it reaches its
(a)    minimum value
(b)    maximum value
(c)    average value
(d)    middle value
(e)    alarming value.
Ans: a

17.    Material handling in automobile industry is done by
(a)    overhead crane
(b)    trolley
(c)     belt conveyor
(d)    all of the above
(e)    none of the above.
Ans: a

18.    String diagram is used when
(a)    team of workers is working at a place
(b)    material handling is to be done
(c)    idle time is to be reduced
(d)    all of the above
(e)    none of the above.
Ans: a

19.    Work study is most useful
(a)    where production  activities  are  involved
(b)    in judging the rating of machines
(c)    in improving industrial relations
(d)    in judging the output of a man and improving it
(e)    where men are biggest contributor to success of a project.
Ans: a

20.    The basic difference between PERT and CPM is that
(a)    PERT deals with events and CPM with activities
(b)    critical path is determined in PERT only
(c)    costs are considered on CPM only and not in PERT
(d)    guessed times are used in PERT and evaluated times in CPM
(e)    PERT is used in workshops and CPM in plants.
Ans: d

21.    Micromotion study is
(a)    enlarged view of motion study
(b)    analysis of one stage of motion study
(c)    minute and detailed motion study
(d)    subdivision of an operation into blither and their analysis
(e)    motion study of small components upto mircoseconds.
Ans: d

22.    In micromotion study, therblig is described by
(a)     a symbol 
(b)     an event
(c)     an activity
(d)     micro motions
(e)     standard symbol and colour.
Ans: e

23.    The allowed time for a job equals standard time plus
(a)    policy allowance
(b)    interference allowance
(c)    process allowance
(d)    learning allowance
(e)    unforeseen allowance.
Ans: a

24.    Micromotion study involves following number of fundamental hand motions
(a)     8
(b)     12
(c)     16
(d)     20
(e)     24.
Ans: c

25.    The standard time for a job is
(a)    total work content
(b)    basie time + relaxation time
(c)    total work content + basic time
(d)    total work content + delay contigency allowance
(e)    total work content + relaxation time.
Ans: d

26. PERT is the
(a)    time oriented technique
(b)    event oriented technique
(c)     activity oriented technique
(d)    target oriented technique
(e)    work oriented technique.
Ans: b

27.    Work study is done with the help of
(a)     process chart
(b)     material handling
(c)     stop watch
(d)     all of the above
(e)     none of the above.
Ans: c

28.    Scheduling gives information about
(a)    when work should start and how much work should be completed during a certain period
(b)    when work should complete
(c)    that how idle time can be minimised
(d)    prcper utilisation of machines
(e)    none of the above.
Ans: a

29.    Expediting function consists in keeping a watch on
(a)    operator's activity
(b)    flow of material and in case of trouble locate source of trouble
(c)    minimising the delays
(d)    making efficient despatching
(e)    none of the above.
Ans: b

30.    Choose the wrong statement Time study is used to
(a)    determine overhead expenses
(b)    provide a basis for setting piece prices or incentive wages
(c)    determine standard costs
(d)    determine the capability of an operator to handle the number of machines
(e)    compare alternative methods.
Ans: a

Read More Questions:
Production Management and Industrial Engineering MCQs Part1
Production Management and Industrial Engineering MCQs Part2

Production Management and Industrial Engineering - Mechanical Engineering Multiple Choice Questions and Answers for competitive exams

1. A graphical device used to determine the break-even point and profit potential under varying conditions of output and costs, is known as
(a)     Gnatt chart
(b)     flow chart
(c)    break-even chart
(d)    PERT chart  
(e)    Taylor chart.
Ans: c

2. Break-even analysis consists of
(a)    fixed cost
(b)    variable cost
(c)    fixed and variable costs
(d)    operation costs
(e)    none of the above.
Ans: c

3. Break-even analysis shows profit when
(a)    sales revenue > total cost
(b)    sales revenue = total cost
(c)    sales revenue < total cost
(d)    variable cost < fixed cost
(e)    none of the above.
Ans: a

4. In braek-even analysis, total cost consists of
(a)    fixed cost
(b)    variable cost
(c)    fixed cost + variable cost
(d)    fixed cost + variable cost + over-heads
(e)    fixed cost + sales revenue.
Ans: a

5. The break-even point represents
(a)    the most economical level of operation of any industry
(b)    the time when unit can run without i loss and profit
(c)    time when industry will undergo loss
(d)    the time when company can make maximum profits
(e)    time for overhauling a plant.
Ans: c

6.    Queing theory is associated with
(a)     sales
(b)     inspection time
(c)     waiting time
(d)     production time
(e)     inventory.
Ans: c

7.    The reasons which are basically responsible for the formation of a queue should be that
(a)    the average service rate HHess than the average arrival rate
(b)    output rate is linearly proportional to input
(c)    output rate is constant and the input varies in a random manner
(d)    all of the above
(e)    none of the above.
Ans: d

8.    Monte Carlo solutions in queuing theory are extremely useful in queuing problems
(a)    that can't be analysed mathematically
(b)    involving multistage queuing
(c)    to verify mathematical results
(d)    all of the above
(e)    none of the above.
Ans: a

9. In the cost structure of a product, the sell¬ing price is determined by the factors such as1
(a)     sales turn over
(b)     lowest competitive price
(c)    various elements of the cost
(d)    buyers' capability to pay
(e)    all of the above.
Ans: e

10.    Work study is concerned with
(a)     improving present method and finding standard time
(b)    motivation of workers
(c)    improving production capability
(d)    improving  production planning  and control
(e)    all of the above.
Ans: a

11.    Basic tool in work study is
(a)    graph paper
(b)    process chart
(c)    planning chart
(d)    stop watch
(e)    analytical mind.
Ans: d

12.    What does symbol 'O' imply in work study
(a)     operation       
(b)     inspection
(c)    transport
(d)    delay temporary storage
(e)    none of the above.
Ans: a
13.    Queing theory is used for
(a)    inventory problems
(b)    traffic congestion studies
(c)    job-shop scheduling
(d)    all of the above
(e)    none of the above.
Ans: d

14.    In queuing theory, the nature of the waiting situation can be studied and analysed mathematically if
(a)    complete details'of items in, waiting line are known
(b)    arrival and waiting times are known and can be grouped to form a waiting line model
(c)    all variables and constants are known and form a linear equation
(d)    the laws governing arrivals, service times, and the order in which the ar¬riving units are taken into source are known
(e)    all of the above.
Ans: d

15.    What does symbol 'D' imply in work study
(a)     inspection
(b)     transport
(c)    delay temporary storage
(d)    permanent storage
(e)    none of the above.
Ans: c