Latest 110 TOP Railway Engineering Multiple choice Questions and Answers

71.    Stretcher bar is provided
a)    to permit lateral movement of the tongue rail
b)    to maintain the two tongue rails at the exact distance
c)    to ensure exact gauge at the toe of the switch as well as the nose of crossing
d)      to prevent any vertical movement between the wing rail and nose of crossing
Ans: b

72. Which of the following methods of designation of crossing is mostly used in India ?
a)    centre line method
b)    right angle method
c)    isosceles angle method
d)    none of the above
Ans: b

73. If a is the angle of crossing, then the number of crossings 'N' according to right angle method is given by
a)    Vi cot(cc/2)
b)    cot(oc/2)
c)    cot(a)
d)    Vi cosec(a/2)
Ans: c

74.    Which of the following turnouts is most commonly used for goods train on Indian Railways ?
a)    1 in 8'/2
b)    1 in 12
c)    1 in 16
d)    1 in 20
Ans: a

75.    Lead of crossing is the distance from the
a)    heel of the switch to the toe of the switch
b)    heel of the switch to the theoretical nose of the crossing
c)    toe of the switch to the theoretical nose of crossing
d)    toe of the switch to the actual nose of crossing
Ans: b

76. Number of switches provided on a Gaunt-letted track is
a)    1
b)    2
c)    3
d)    none of the above
Ans: d

77. The correct relation between curve lead (CL), switch lead (SL) and lead of cros¬sing (L) is given by
a)    CL = L - SL
b)    L =CL-SL
c)    SL = L + CL
d)    L = (CL+SL)/2
 Ans: b

78.    In a scissors cross-over, the crossings provided are
i)    2 obtuse angle crossings
ii)   4 obtuse angle crossings
iii)  4 acute angle crossings
iv)   6 acute angle crossings The correct answer is
a)    (i) and (iii)
b)    (i)and(iv)
c)    (ii) and (iii)
d)    (ii) and (iv)
Ans: b

79.    The distance through which the tongue rail moves laterally at the toe of the switch for movement of trains is called
a)    flangeway clearance
b)    heel divergence
c)    throw of the switch
d)    none of the above
Ans: c

80.    Flangeway clearance is the distance
a)    between the adjoining faces of the running rail and the check rail near the crossing
b)    between the gauge faces of the stock rail and the tongue rail
c)    through which the tongue rail moves laterally at the toe of the switch
d)    none of the above
Ans: a
More Railway Engineering Questions and Answers:-
Part1 Part2 Part3 Part4 Part5 Part6 Part7 Part8 Part9 Part10

RAILWAY ENGINEERING Questions and Answers pdf free download pdf

11.    Head width of 52 kg rail section is
a)    61.9 mm
b)    66.7mm
c)    67mm
d)    72.33 mm
Ans: c

12.     60 R rails are mostly used in
a)    Broad Gauge
b)    Metre Gauge
c)    Narrow Gauge
d)    none of the above
Ans: b

13.    Ordinary rails are made of
a)    mild steel
b)    cast iron
c)    wrought iron
d)    high carbon steel
Ans: d

14.    The main function of a fish plate is
a)    to join the two rails together
b)    to join rails with the sleeper
c)    to allow rail to expand and contract freely
d)    none of the above
Ans: a
 
15.    Number offish bolts per fish plate is
a)    2
b)    4
c)    5
d)    6
Ans: b

16.    Fish plate is in contact with rail at
a)    web of rail
b)    fishing plane
c)    head of rail
d)    foot of rail
Ans: b

17.    Gauge is the distance between
a)    center to center of rails
b)    running faces of rails
c)    outer faces of rails
d)    none of the above
Ans: b

18.    Which of the following factors govern the choice of the gauge ?
i)    volume and nature of traffic
ii)    speed of train
iii)    physical features of the country
The correct answer is
a)    only (i)
b)    both (i) and (ii)
c)    both (ii) and (iii)
d)    (i), (ii) and (iii)
Ans: d

19.    For developing thinly populated areas, the correct choice of gauge is
a)    Broad Gauge
b)    Meter Gauge
c)    Narrow Gauge
d)    any of the above
Ans: c

20. Due to battering action of wheels over the end of the rails, the rails get bent down and are deflected at ends. These rails are called
a)    roaring rails
b)    hogged rails
c)    corrugated rails
d)    buckled rails
Ans: b