Objective Production Technology Questions and Answers pdf

141. The disadvantage of product layout is
(a)    high initial investment for the specialized facilities
(b)    skilled labour to operate machines
(c)    production time is longer, requiring more goods in inventory
(d)    high cost of inspection
(e)    costly and complex production control.
Ans: a

142. Emergency rush order can be pushed more effectively in
(a)    job production
(b)    automatic production
(c)    continuous production
(d)    intermittent production
(e)    none of the above.
Ans: d

143.    Routing assists engineers in deciding in advance
(a)    the flow of material in the plant
(b)    the methods of proper utilization of manpower
(c)    the methods of proper utilization of machines
(d)    the layout of factory facilities
(e)    normal route of workers through the plant.
Ans: c

144.    The performance of a specific task in CPM is known as
(a) dummy 
(b) event
(c) activity 
(d) contract
(e) none of the above.
Ans: c

145.    Pick up the incorrect statement from the following
(a)    an activity of the project is denoted by an harrow on the net work
(b)    the tail of the arrow indicates the start of the activity
(c)    the head of the arrow indicates the end of the activity
(d)    the arrows are drawn (to scale from; left to right)
(e)    each activity consumes a given time.-
Ans: d

146.    The artificial activity; which indicates that an activity following it cannot be started unless, the preceding activity is complete, is known as
(a) event 
(b) free float
(c) artificial 
(d) constraint
(e) dummy.
Ans: e

147.    A dummy activity
(a)    is artificially introduced
(b)    is represented by a dotted line
(c)    does not require any time
(d)    all of the above
(e)    none of the above.
Ans: d

148.    If E is the duration, ES and EF are die earliest start and finish times, LS and LF are latest start and finish times, then the following relation holds good
(a) EF=ES+D
(b) LS=LF-D
(c) LF = LS + D
(d) D = EF-ES
(e) all of the above.
Ans: e

149.    The difference between the time available to do the job and the time required to do the job, is known as
(a) event 
(b) float
(c) duration 
(d) constraint
(e) none of the above.
Ans: b

150.    The probability distribution of activity times in PERT follows following distribution
(a) normal 
(b) binomial
(c) beta 
(d) exponential
(e) Gaussian.
Ans: c

151.    The probability distribution of project completion in PERT follows following distribution
(a) normal 
(b) binominal
(c) beta 
(d) exponential
(e) Gaussian.
Ans: e

152.    If TL is the largest allowable event occurrence time, total activity slack (s) is equal to
(a)    latest start time - earliest start time
(b)    latest finish time - earliest finish time (EFT)
(c)    TLEFT
(d)     all of the above
(e)     none of the above.
Ans: d

153.    The critical activity has
(a) maximum float
(p) minimum float
(c) zero float,
(d) average float
(e) none of these.
 Ans: c

154.    The time by which the activity completion time can be delayed without affecting the start of succeeding activities, is Known as
(a) duration 
(b) total float
(c) free float 
(d) interfering float
(e) none of the above.
Ans: c

155.    The critical path of a network represents
(a)    the minimum time required for completion of project
(b)    the maximum time required for completion of project
(c)    maximum cost required for completion of project
(d)    minimum cost required for completion of project
(e)    none of the above.
Ans: a

156.    Pick up the correct statement from the following
(a)    the float may be positive, zero or negative
(b)    if the float is positive and the activity is delayed by a period equal to its total float, the completion of project in not delayed
(c)    if the float of an activity is negative, delay in its performance is bound to delay the completion of project
(d)    if the float of an activity is zero, the activity is critical and any delay in its performance will delay the whole project
(e)    all of the above.
Ans: e

157.    Critical path moves along the activities having total float of
(a) positive value
(b) negative value
(c) zero value   
(d) same value
(e) none of the above.
Ans: c

158.    Critical Path Net Work helps an engineer
(a)    to concentrate his attention on critical activities
(b)    to divert the resources from non-critical advanced activities to critical activities
(c)    to be cautious for avoiding any delay in the critical activities to avoid delay of the whole project
(d)     all of the above
(e)     none of the above.
Ans: d

159.    Pick up the correct statement about relationship between various floats
(a)    free float = total float
(b)    independent float = total float
(c)    independent float > free float
(d)    free float > total float
(e)    independent float < free float.
Ans: e

160.    The time which results in the least possible direct cost of an activity is known as
(a) normal time 
(b) slow time
(c) crash time    
(d) standard time
(e) none of the above.
Ans: b

Read More Questions:
Production Technology - Mechanical Engineering MCQs Part1
Production Technology - Mechanical Engineering MCQs Part2

Realtime Production Technology Multiple choice Questions and Answers pdf

61.    Standing orders which are statutory are applicable to
(a)    all industries
(b)    all process industries and thermal power plants
(c)    only major industries
(d)    only key industries
(e)    all industries employing more than 100 workers.
Ans: e

62.    Acceptance sampling is widely used in
(a)    bacth production
(b)    job production
(c)    mass production
(d)    all of the above
(e)    none of the above.
Ans: c

63.    The technique of value analysis can be applied to
(a)    complicated items only
(b)    simple items only
(c)    crash-programme items only
(d)    cost consciousness items only
(e)    any item.
Ans: e

64.    The term 'value' in value engineering refers to
(a)    total cost of the product
(b)    selling price of the product
(c)    utility of the product
(d)    manufactured cost of the product
(e)    depreciation value.
Ans: c

65.    Value engineering aims at finding out the
(a)    depreciation value of a product
(b)    resale value of a product
(c)    major function of the item and accomplishing the same at least cost without change in quality
(d)    break even point when machine re-quires change
(e)    selling price of an item.
Ans: c

66.    In the perpetual inventory control, the material is checked when it reaches its
(a)    minimum value
(b)    maximum value
(c)    average value
(d)    alarming value
(e)    original value.
Ans: a

67.    According to MAPI formula, the old machine should be replaced by new one when
(a)    CAM < DAM
(b)    CAM > DAM
(c)    CAM = DAM
(d)    there is no such criterion
(e)    none of the above.
(CAM = Challenger's Adverse minimum DAM = Defender's Adverse minimum)
Ans: a

68.    Merit Rating is the method of determining worth of
(a)    a job
(b)    an individual employee
(c)    a particular division in workshop
(d)     machine
(e)     overall quality.
Ans: b

69.    Material handling and plant location is analyzed by
(a)     Gnatt chart  
(b)     bin chart
(c)     Emerson chart
(d)    travel chart  
(e)     activity chart.
Ans: d

70.    Works cost implies
(a)     primary cost
(b)     factory cost
(c)     factory expenses
(d)     primary cost + factory expenses
(e)    none of the above.
Ans: d

71.    Motion study involves analysis of
(a)    actions of operator
(b)    layout of work place
(c)    tooling and equipment
(d)     all of the above
(e)     none of the above.
Ans: a

72.    Standard time as compared to normal time is
(a)     greater 
(b)     smaller
(c)    equal
(d)    there is no such correlation
(e)    none of the above.
Ans: a

73.    Pick up the incorrect statement about advantages of work sampling
(a)    permits a fine breakdown of activities and delays
(b)    simultaneous study of many operators may be made by a single observer
(c)    calculations are easier, method is economical and less time consuming
(d)     no time measuring devices are generally needed
(e)     as operators are not watched for long periods, chances of obtaining misleading results are less.
Ans: a

74.    In which of the following layouts, the lines need to the balanced
(a)    process layout
(b)    product layout
(c)    fixed position layout
(d)    plant layout
(e)    functional layout.
Ans: b

75.    Which of the following layouts is suited for mass production
(a)    process layout
(b)    product layout
(c)    fixed position layout
(d)     plant layout
(e)     functional layout.
Ans: b

76.    Which of the following layouts is suited to job production
(a)    process layout
(b)    product layout
(c)    fixed position layout
(d)    plant layout
(e)    functional layout.
Ans: a

77.    The employees provident fund act is applicable to
(a)    all industries
(b)    all industries other than small and medium industries
(c)    volunteers
(d)    the industries notified by Government
(e)    all major industries.
Ans: d

78.    The amount deducted from the salary of workers towards employees provident fund is
(a)    credited into reserves of company
(b)    deposited in nationalized bank
(c)    deposited in post office
(d)    deposited in the account of worker with employer or Reserve Bank of India
(e)    deposited in the account of worker with Provident Fund Commissioner.
Ans: e

79.    The deductions for, employees provident fund start
(a)    immediately on joining the service
(b)    after 60 days of joining the service
(c)    after 100 days of joining the service
(d)    after 240 days of joining the service
(e)    after one year of joining the service.
Ans: d

80.    Father of time study was
(a) F.W. Taylor 
(b) H.L. Gantt
(c) F.B. Gilberfh
(d) R.M. Barnes
(e) H.B. Maynord.
Ans: a

Read More Questions:
Production Technology - Mechanical Engineering MCQs Part1
Production Technology - Mechanical Engineering MCQs Part2